Place of Origin: | China |
---|---|
Brand Name: | CESGATE |
Certification: | UL、IATF16949、ISO9001 |
Model Number: | N/A |
Minimum Order Quantity: | 1PCS( No MOQ) |
Price: | Negotiable (Depends on your BOM) |
Packaging Details: | Customized cartons according to product size and weight, with crashproof foam |
Delivery Time: | 1-2 working days |
Payment Terms: | T/T, L/C |
Supply Ability: | 10,0000PCS per day |
Product Name: | Stock Original Brand New Authorized BOM Services SMD ICs Components Sourcing | Feature: | Original Brand New |
---|---|---|---|
Quality: | 100% New And Original | Part Status: | Active Or Discontinued |
Source: | Major Global Authorized Distributors | Operating Temperature: | Operating Temperature |
Encryption: | AES-XTS-based Flash Encryption | Manufacturer: | Any |
High Light: | UL IATF16949 SMD ICs,SMD ICs pcb electronic components,UL IATF16949 pcb electronic components |
Stock Original Brand New Authorized BOM Services SMD ICs Components Sourcing
Lead-time for PCB Components Sourcing
This is the duration required to manufacture a component. It includes order preparation, queue, setup, run, inspection and put-away time.
For products made on an order, it’s the time taken from the release of an order, to production and shipment.
Escalating lead time is one of the emerging trends in Electronic componfent sourcing. This creates a big challenge for purchasing communities.
There is usually no stability when it comes to lead times.
Escalating lead times is a complicated situation rising due to market demands, investment constraints and capacity allocations in some regions.
Lead-time usually is between 5- 8 working days from the initial day of order. For mass production lead time can take up to 2 weeks.
However, this may differ from one region to the other. For example, Lead times for resistors in North America had moved from 12 to 16 weeks by the beginning of 2017.
What is PCB Components Sourcing?
PCB Component sourcing refers to the purchasing the SMD ICs to be assembled onto the printed circuit board.Component sourcing can be done in many ways.You can have the suppliers purchase components from authorized and reliable distributors of their choice and deliver to you by order.You can also recommend a distributor where the supplier can source the SMD ICs from and deliver to you.Still, you can opt to source for some SMD ICs and let another supplier source the rest.Component sourcing can either be done locally or from abroad. International component sourcing usually takes around 5-10 working days depending on the duration of customs clearance.Local sourcing, on the other hand, takes a shorter time. It is therefore preferred, especially if all the required components are available because it helps save on time and production cost.
Your Leading Component Sourcing Supplier in China
1. Quick response mechanism
2. Available capacitive resistance, inductance magnetic bead connector
3. Regular R&D procurement, complete set within two weeks
4. Professional component certification engineer
Welcome to Chengdu Cesgate Technology Co., Ltd
We can provide one-stop service:
PCB circuit boards+Assembly
E-test.
Electronic components purchasing.
PCB assembly: available on SMT, BGA, DIP.
PCBA function test.
Enclosure assembly.
FAQ
Q: How long is the shelf life of the PCB board and how should it be stored? CESGATE: 25℃ / 60%RH is recommended when the PCB is stored. The plate itself has no shelf life, but if it exceeds three months, it needs to be baked to remove moisture and stress, and it should be used immediately after baking. It is recommended that the pieces should be loaded within 6 months of storage to reduce the phenomenon of rejection and explosion. |
Q: What is your delivery date? CESGATE: The general sample delivery time is 6 working days for single and double-sided boards, 7 working days for 4-layer boards, and an additional working day for every 2 layers. However, if there are special processes, additional working days will be added according to the situation. Generally, the delivery time for mass production is 10 working days for single and double-sided panels, and 15 working days for multi-layer panels. However, if there is a special process or more than a certain number of working days, the working days will be additionally increased according to the situation; you can also pay the urgent fee to shorten the number of days, please contact Contact the business specially proposed, depending on the individual situation to provide expedited days. |
Q: What is the difference between the HDI board and the general circuit board? CESGATE: Most of HDI use laser to form holes, while general circuit boards only use mechanical drilling, and HDI boards are manufactured by the build-up method (Build Up), so more layers will be added, while general circuit boards are only added once. |
To get a component quote, pls send an inquiry to info@cesgate.com we will get back to you in one hour.