Place of Origin: | China |
---|---|
Brand Name: | CESGATE |
Certification: | UL、IATF16949、ISO9001 |
Model Number: | N/A |
Minimum Order Quantity: | 1PCS( No MOQ) |
Price: | Negotiable (Depends on your BOM) |
Packaging Details: | Customized cartons according to product size and weight, with crashproof foam |
Delivery Time: | 1-2 working days |
Payment Terms: | T/T, L/C |
Supply Ability: | 10,0000PCS per day |
Product Name: | Quick Turn Pcb Assembly Custom Pcb Printing And Assembly SMD ICs Piping Bom | Feature: | Quick Turn Pcb Assembly |
---|---|---|---|
Quality: | 100% New And Original | Part Status: | Active Or Discontinued |
Source: | Major Global Authorized Distributors | Operating Temperature: | Operating Temperature |
Encryption: | AES-XTS-based Flash Encryption | Lead Free Status: | Lead Free |
High Light: | AES XTS based flash encryption SMD ICs,SMD ICs Quick Turn Pcb Assembly,SMD ICs Piping Bom |
Quick Turn Pcb Assembly Custom Pcb Printing And Assembly SMD ICs Piping Bom
What is PCB Components Sourcing?
PCB Component sourcing refers to the purchasing the SMD ICs to be assembled onto the printed circuit board.Component sourcing can be done in many ways.You can have the suppliers purchase components from authorized and reliable distributors of their choice and deliver to you by order.You can also recommend a distributor where the supplier can source the SMD ICs from and deliver to you.Still, you can opt to source for some SMD ICs and let another supplier source the rest.Component sourcing can either be done locally or from abroad. International component sourcing usually takes around 5-10 working days depending on the duration of customs clearance.Local sourcing, on the other hand, takes a shorter time. It is therefore preferred, especially if all the required components are available because it helps save on time and production cost.
Your Leading Component Sourcing Supplier in China
1. Quick response mechanism
2. Available capacitive resistance, inductance magnetic bead connector
3. Regular R&D procurement, complete set within two weeks
4. Professional component certification engineer
Who are we?
PCB manufacturer located in Chengdu.
Over 300 total staff
25,000sqm production capacity
Advanced automatic production equipments
Offers various kinds PCBs, small to medium to mass quantity orders
Major markets include domestic China, Asia, Europe and North America
Customers include OEM/ODM factories, PCBA factories, EMS, trading companies
FAQ
Q: How long is the shelf life of the PCB board and how should it be stored? CESGATE: 25℃ / 60%RH is recommended when the PCB is stored. The plate itself has no shelf life, but if it exceeds three months, it needs to be baked to remove moisture and stress, and it should be used immediately after baking. It is recommended that the pieces should be loaded within 6 months of storage to reduce the phenomenon of rejection and explosion. |
Q: What is your inspection policy? How do you control the quality? CESGATE: In order to ensure the quality of PCB products, flying probe inspection is usually used; electrical fixtures, automatic optical inspection (AOI), BGA parts x-ray inspection, first article inspection ( FAI) etc. |
Q: Why choose us? CESGATE: Professional and experienced R&D team. Advanced production equipment, scientific and reasonable process flow. Reliable and strict quality control system. We test all our products before shipment to make sure everything is in perfect condition. |
Q. What file formats do you accept for production? CESGATE: Gerber file: CAM350 RS274X PCB file: Protel 99SE, P-CAD 2001 PCB BOM: Excel (PDF,word,txt) |
Q: DO YOU TEST ALL YOUR GOODS BEFORE DELIVERY? CESGATE: 1. Our products are all original, and we will test the goods before shipment by professional machines like KEYSIGHT E4991A and KEYSIGHT E4980. 2. If The buyer need Test Report, we can send the product to anthoritative institution such as White horse Laboratories(SZ) Limited,Global Electronics Testing,etc. |
To get a component quote, pls send an inquiry to info@cesgate.com we will get back to you in one hour.