Place of Origin: | China |
---|---|
Brand Name: | CESGATE |
Certification: | UL、IATF16949、ISO9001 |
Model Number: | N/A |
Minimum Order Quantity: | 1PCS( No MOQ) |
Price: | Negotiable (Depends on your BOM) |
Packaging Details: | Customized cartons according to product size and weight, with crashproof foam |
Delivery Time: | 1-2 working days |
Payment Terms: | T/T, L/C |
Supply Ability: | 10,0000PCS per day |
Product Name: | Passive Electrical Components SMD ICs Distributors Quick Turn Pcb Assembly | Feature: | Passive Electrical Components |
---|---|---|---|
Quality: | 100% New And Original | Part Status: | Active Or Discontinued |
Source: | Major Global Authorized Distributors | Manufacturer: | Any |
BOM: | Supported | MOQ: | No MOQ |
High Light: | Passive Electrical Components SMD ICs,SMD ICs Quick Turn Pcb Assembly |
Passive Electrical Components SMD ICs Distributors Quick Turn Pcb Assembly
If you are looking for a reliable component sourcing partner? You’ve come to the right place.No matter you are an electrical engineer, a product designer, a system integrator or a maker looking for component sourcing, Venture will be your perfect partner China.
Through our 2 hours rapid response services from our 24/7 sales and tech support team, and excellent after-sales service, we will be your best component sourcing partner and supplier in China.
At Venture we can help you reduce vendor count, production delays, pls feel free to contact us anytime for your component sourcing projects.
Lead-time for PCB Components Sourcing
This is the duration required to manufacture a component. It includes order preparation, queue, setup, run, inspection and put-away time.
For products made on an order, it’s the time taken from the release of an order, to production and shipment.
Escalating lead time is one of the emerging trends in Electronic component sourcing. This creates a big challenge for purchasing communities.
There is usually no stability when it comes to lead times.
Escalating lead times is a complicated situation rising due to market demands, investment constraints and capacity allocations in some regions.
Lead-time usually is between 5- 8 working days from the initial day of order. For mass production lead time can take up to 2 weeks.
However, this may differ from one region to the other. For example, Lead times for resistors in North America had moved from 12 to 16 weeks by the beginning of 2017.
Advantages of Sourcing Components from PCB Manufacturer
How to Get Quotation for PCB Components Sourcing
Getting a quotation for a PCB component sourcing involves uploading a complete BOM on-line into a contract manufacturer’s website.
You can then request a quotation which can be sent to you in a few hours. The following are the steps involved.
FAQ
Q. What file formats do you accept for production? CESGATE: Gerber file: CAM350 RS274X PCB file: Protel 99SE, P-CAD 2001 PCB BOM: Excel (PDF,word,txt) |
Q.Shipping cost? CESGATE: The shipping cost is determined by the destination, weight, packing size of the goods. Please let us know if you need us to quote you the shipping cost. |
Q: What certificates do you have? CESGATE: We have ISO 9001, ISO14001 and UL certificates. |
Q: Which express companies do you cooperate with? CESGATE: We cooperate with express companies, including DHL, FedEX, UPS, TNT and EMS. And we also have our own freight forwarders, with lower shipping fees. |
Q: What modes of transport are there? CESGATE: Usually includes express, air shipment, rail shipment and sea shipment. |
To get a component quote, pls send an inquiry to info@cesgate.com we will get back to you in one hour.